In the pursuit of efficient lighting solutions, TUBU LED Batten Light has become the first choice for many industrial, commercial and outdoor lighting projects due to its outstanding performance and wide applicability. In order to ensure that you can safely and quickly complete the installation and wiring of LED Batten Light, TUBU hereby provides the following professional guide to help you get started easily.
Preparation
Check accessories: Before starting the installation, please make sure you have all the necessary accessories, including the LED Batten Light body, mounting brackets, fixing screws, wire connectors, insulating tape, and control devices (e.g., dimmers, sensors, etc.) that may be needed.
Turn off the power: Before doing any electrical work, be sure to cut off the power to the relevant circuits and use a voltage tester to confirm that the circuits are completely free of electricity to ensure safety.
Mounting Bracket
Determine the location: According to the lighting requirements, choose a suitable mounting location and make sure that the location can withstand the weight of the lamps and lanterns.
Mounting bracket: Use the provided mounting bracket and fixing screws to install the bracket firmly in the intended position. Ensure that the bracket is mounted smoothly and without shaking.
Wiring Steps
Identify Wires: First, identify the wires on the LED Batten Light, which usually include Fire (L), Zero (N) and Ground (PE). At the same time, confirm the corresponding markings on the power cord.
Strip the insulation: Using wire strippers or a razor blade, carefully strip the insulation from the end of the wire to expose the metal core, which is about 1.5-2 centimeters. Be careful not to damage the wire core.
Connecting the wires: Using wire connectors or direct winding, connect the LED Batten Light's Fire and Zero wires to the corresponding cores of the power cord. For the ground wire, make sure it is connected directly to the grounding device. When connecting, make sure the wires are tightly connected with no exposed parts.
Insulation treatment: Use insulating tape or heat-shrink tubing to insulate the connections to prevent short-circuiting or risk of electric shock.
Mounting the Fixture
Hanging the fixture: Gently hang the LED Batten Light on the mounted bracket and fasten it with set screws. Ensure that the fixture is mounted smoothly without tilting or shaking.
Connect the control device (if any): If your LED Batten Light is equipped with control devices such as dimmers, sensors, etc., please connect and set them according to the requirements of the product manual.
Testing and Commissioning
Restore power: After ensuring that all wiring work has been completed and is error-free, restore power to the circuit.
Test lighting: Turn on the power switch and observe whether the LED Batten Light lights up normally. If necessary, adjust the illumination angle of the fixture or the setting of the control device to achieve the best lighting effect.
Check safety: Finally, double-check that all wiring is secure and reliable with no exposed parts. At the same time, make sure there are no flammable items around the fixture to ensure safe use.
With the above steps, you have successfully completed the installation and wiring of LED Batten Light. We are confident that this high performance LED tri-proof light will bring a brighter, energy efficient and environmentally friendly lighting experience to your lighting project. If you have any questions or need further technical support, please feel free to contact TUBU customer service team. We will be happy to serve you.